BABIYACHAUR, Sept 17: Vehicular movement has been disrupted along the Beni-Ghansa road section linking northern belt of Myagdi and trans-Himalayan district Mustang from Saturday.
The road traffic has come to a halt along the road section when the flood-fed Beg rivulet based in Beg-6 swept away the temporary road here.
Pilgrims and tourists stranded in Mustang
The standstill of vehicular movement has directly affected local farmers especially at a time which is appropriate for supplying apple.
Buddhi Pun, a local, shared that the flood occurred on September 2 had taken away the road and Bailey bridge causing inconvenience to the movement of the local people. RSS