header banner
ECONOMY

Electricity production slumps by more than half in Ilam and Panchthar

KATHMANDU, March 4: The production by hydropower projects in Ilam and Panchthar districts has declined by more than half. The production has decreased by more than half as the water level in the rivers in the district has receded in winter.
By Republica

KATHMANDU, March 4: The production by hydropower projects in Ilam and Panchthar districts has declined by more than half. The production has decreased by more than half as the water level in the rivers in the district has receded in winter.


Related story

Green leaves production down by half


The power sub-station in Ilam is currently generating 37 MW from 10 hydropower projects. Although the hydropower projects have a capacity to produce 97 megawatts of energy, the production has dropped by more than half, according to Electrical Foreman Mahesh Kumar Shah of the sub-station. 


According to Shah, the Panchakanya Hydropower Project, which has a capacity of 25.8 megawatts is currently generating just five megawatts. The Sanima Mai project which has a capacity of producing 29 megawatts is producing 7.8 megawatts. The Sagarmatha project is currently generating 2.9 megawatts, Mai Beni project 2.1 megawatts, lower Jogmai Khola project 1.1 megawatts, Jogmai Khola project 1.2 megawatts and Puwa Khola project 2.4 megawatts. 

Related Stories
ECONOMY

7.5 MW-Jogmai project starts power generation

SOCIETY

Power supply disrupted in eastern hilly districts

ECONOMY

Transmission test of Hewa Khola Hydel Project unde...

ECONOMY

Tamakoshi power developer to generate power by one...

ECONOMY

Power produced from Hewakhola Hydel Project 'A' co...

Trending

Top Videos

Bold Preety willing to fight for her musical career

Awareness among people on heart diseases has improved in Nepal’

Print still remains the numbers of one platform

Bringing home a gold medal is on my bucket

What is Nepal's roadmap to sage child rights