header banner
SOCIETY, Latest Updates

Beni-Jomsom road resumes

Jomsom, Dec 31 : The Beni-Jomsom road that connects the trans-Himalayan district of Mustang with the rest of the country has been opened for traffic after four days of disruption.
By RSS

Jomsom, Dec 31 : The Beni-Jomsom road that connects the trans-Himalayan district of Mustang with the rest of the country has been opened for traffic after four days of disruption.


The road was blocked after a dry landslide occurred at Guithebhir of Annapurna rural municipality-3 in Myagdi district. The road was obstructed by the landslide debris deposited on the highway since December 27.


Related story

One-way traffic resumes on Prithvi Highway


The 76-kilometre-long road was opened for traffic after the landslide debris was cleared on Monday evening. Vehicles bound to Jomsom from Beni and vice-versa were stranded after the obstruction of the road by landslip.


Meanwhile, traffic along the Beni-Jomsom road is to be stopped for eight hours daily for carrying out upgrading and expansion works.


Vehicles would be stopped from operating from 7.30 am to 11am and from 2.30 pm to 6 pm, chief of Beni-Jomsom Road Upgrading Project, Mukunda Adhikari, said.


 

Related Stories
SOCIETY

Obstructed Beni-Darbang road traffic resumes after...

SOCIETY

KMC resumes footpath widening work in New Road are...

SOCIETY

Traffic resumes on Karnali corridor roadway

SOCIETY

Traffic resumes on Narayanghat–Mugling road

SOCIETY

Traffic resumes on Besisahar-Chame road

Trending

Top Videos

Bold Preety willing to fight for her musical career

Awareness among people on heart diseases has improved in Nepal’

Print still remains the numbers of one platform

Bringing home a gold medal is on my bucket

What is Nepal's roadmap to sage child rights