header banner
POLITICS

KMC directs all concerned to get design approval of buildings, if built in line with the existing building code, within 90 days

KATHMANDU, Sept 8: Kathmandu Metropolitan City (KMC) has directed all concerned to approve the design of their buildings within 90 days if they are built in line with the existing building code of the Kathmandu metropolis.
By Republica

KATHMANDU, Sept 8: Kathmandu Metropolitan City (KMC) has directed all concerned to approve the design of their buildings within 90 days if they are built in line with the existing building code of the Kathmandu metropolis. 


Issuing a notice, the metropolis has instructed the buildings to pass the design approval within 3 months, whose construction has met the required standards but the design approval has not been passed. 


Related story

PM directs authorities to ascertain legitimacy of Ncell's share...


"If the government, private or any kind of buildings constructed within the Kathmandu metropolitan area are built without obtaining design approval but meet the required standards, owners of such buildings are requested to submit application for the design approval within 90 days from the date of publication of the notice," reads the notice.


 

See more on: 90_days
Related Stories
POLITICS

EC directs Urban Development Ministry to cancel pr...

SOCIETY

Dozens of government buildings being built without...

POLITICS

PM directs officials to expedite construction of n...

POLITICS

Govt bodies found negligent in constructing numero...

POLITICS

KMC instructs all concerned to remove illegal stru...

Trending

Top Videos

Bold Preety willing to fight for her musical career

Awareness among people on heart diseases has improved in Nepal’

Print still remains the numbers of one platform

Bringing home a gold medal is on my bucket

What is Nepal's roadmap to sage child rights