BAGLUNG, July 19: The Kaligandaki Corridor, a project of national pride that was blocked since July 5, has now come into operation.
Heavy rain had caused a part of the road to be washed away in Dablyang, Baglung Municipality-10, blocking the route.
Kushma-New Butwal 220 kV transmission line comes into operation
According to the District Police Office, after the rain stopped, the Corridor Office constructed a gabion wall to repair the flooded road.
The two-week blockage had halted vehicles traveling to Butwal, Bhairawa, Muktinath, and Dakshin Baglung.